A renovation is the one job where the order things happen in matters as much as the work itself. Rip out a wall before the electrics are marked up and you're chasing cable runs through finished plaster. Most renovation overruns aren't bad workmanship — they're work done twice because a trade turned up in the wrong order.

The media wall under construction: a metal stud and plasterboard carcass with openings formed for the television, fire and shelving
Before
The same media wall finished: inset television, glass shelving and a built-in electric fire
After

The Sequence Is The Plan

Structural work, then first-fix plumbing and electrics, then plastering, then finishes — in that order, with the same people carrying it through from one stage to the next. Nobody arrives to find the last trade left something unfinished.

  • Nothing plastered over until the structural work's checked
  • First-fix plumbing and electrics before any wall goes back up
  • One fixed-price quote covering the whole job
  • Snagging cleared before we call it finished