A kitchen or bathroom out of action is the part that actually hurts — not the design choices, the weeks without a working sink or shower. What determines how long that lasts is the order the trades go in: plumbing and electrics first-fixed before a single tile goes up, not worked around afterwards. Get that sequence wrong and a two-week job turns into a month of takeaways and boiling kettles for a wash.

The kitchen stripped back before refit: units removed, old wall tiles still up and the pipework exposed at the sink position
Before
The same kitchen refitted by SPJ: sage green units, a marble-effect worktop and an inset sink under the window
After

First Fix Before Finishes

Plumbing and electrics go in and get tested before any tiling starts, so nobody's channelling out a wall that's already been tiled. The same people who did the first fix come back for the finish, so nothing's guessed at from someone else's notes.

  • Water and power isolated safely before work begins
  • Plumbing and electrics first-fixed before any tiling starts
  • Same team for first fix through to final fit
  • Extraction, taps and fittings tested before we leave
The bathroom before refit: the original bath and shower riser, a chrome ladder towel rail and dated tiling, with the vanity stripped back
Before
The same bathroom refitted by SPJ: large-format stone-effect tiling, a wall-hung grey gloss vanity unit, a round mirror and an anthracite heated towel rail
After

Bathrooms Run The Same Way

A bathroom follows the same order as a kitchen: water and power isolated, first-fix plumbing and electrics in and tested, then tiling, then the fit-out. The people who did the first fix are the ones who come back to finish it.

Getting that sequence right is what decides how long you're without a shower, rather than how the room looks on the last day.