Our Services
Extensions
Will Building Control hold this up? That's the real question on most extensions, not what the brickwork looks like. Every stage — foundations, drainage, steelwork if the design needs it — gets signed off before the next one starts, and a missed inspection is what actually stalls a job, not a shortage of bricklayers. Simon deals with the structural calculations and the Building Control visits directly, so nothing's waiting on a stage nobody booked in.
Signed Off At Every Stage
An extension goes through Building Control in stages, not one inspection at the end. Foundations, damp-proofing, drainage, structural steel where it's needed — each one gets checked before the next stage starts, and Simon's the one dealing with the inspector.
- Structural calculations arranged before work starts
- Steelwork installed where the design calls for it
- Building Control inspections booked at each stage
- Making good inside and out once the structure's signed off